|
|
|
Liu and Li finishes drawing all the diagrams (Class diagram and Interaction diagram. It takes around 2 hours (Estimate: 1.5 hours). Zhang and Zhong finishes Action plan, Implementation and tests. It takes around 3 hours.(Estimate: 4 to 5 hours) As for the next milestone, Zhong and Zhang will finish the introduction and Scope.(Estimate: 0.5 hour) Li will focus on the quality objective (Estimate: 1.5 hours). As for role and responsibilities, Zhong and Zhang will focus on the design of the website (Hard to estimate). Li and Liu will focus on connecting the database with the website (Hard to estimate). As for the inspection and test methodology, we will probably use regression test and group inspection. (5 hours as estimated). |