***Product Alpha***
<br>
<br>
**Prioritized User Stories and Project Progress:<br>**
*
*Beta Focuses*
*1. Searching for flights: 50%* (Searching **Connection Flights** stays at the highest difficulty level of this project at all times)<br>
*2. Retrival of reservation: 10%*<br>
*3. Usability of web pages: 25%*<br>
*4. Origin Time Indication: 5%*
<br>
*
**Alpha Focuses**
<br>
5.
Displaying search results: 80%
<br>
6.
Language options of pages: 60%
<br>
7.
Security of payment page: 70%
<br>
8.
About page of the company: 90%
<br>
<br>
**Testing of User Stories:**
*
*Following the order of the above*
*
1. Searching for flight routes: null, existing, non-completed, completed, duplicate, etc.
<br>
*
2. Retrieval of reservation: retrievable, correct, incorrect, multiple, etc.
<br>
*
3. Usability of web pages: general web application testing will be applicable here.
<br>
*
4. Origin Time Indication: check if both origin time displaying or not, the correctness of the time, etc.
<br>
*
5. Displaying search results: check if the results will show up or not, the correctness of the results, etc.
<br>
*
6. Language options of pages: check if language choices exist, choices are clickable or not, etc.
<br>
*
7. Security of payment page: check if payment information still exist in database or not, etc.
<br>
*
8. About page of the company: Responsiveness, completeness, etc.
<br>
<br>
<hr>
**ReadMe:**
<br>
<br>
How to run:
Use
**git clone https://git.cs.usask.ca/yol474/cmpt370-fantastic-4.git**
in the command line
Requires
**nodeJs**
to run.
<br>
Run the following commands inside the
**air370proj folder**
containing the
app.js file, the database, and the views folder.
<br>
**
npm init
<br>
npm install sqlite3
<br>
npm install express
<br>
npm install ejs
<br>
**
Finally, run
**'node app.js'**
in the terminal to start the server.
<br>
The localhost will be listening at: http://localhost:2020/search
**Current Restrictions**
Only direct flights can be used currently the other options will refresh page.
<br>
Examples of available flights for testing:
*
Calgary to London
*
Saskatoon to Calgary
*
Calgary to Paris
<br>
<hr>
**Action Plan**
<br>
*Fantastic 4*
:
<br>
All team members had participated in two scheduled weekly meetings as usual.
<br>
Alpha related issues had been discussed and resolved;
These two meetings were used as mostly workshop hours for this milestone.
<br>
Time spent as a team: 2.5 hours (1.5 hours of Tuesday meeting, 1 hour of Thursday meeting, 2.5 hours in total)
Ali (Back-End):
<br>
Worked closely with Jordan, completing about 50% of the database plus basic information of pages.
<br>
Will continue to address issues regarding the Beta focuses 1, 2, & 4 as indicated above.
<br>
Individual time spent on Milestone 8: 15 hours
<br>
Individual time will be spent on Milestone 9: 10 hours
Jordan (Back-End):
<br>
Scheduled and booked a team meeting room as a regular weekly task.
<br>
Worked closely with Ali, completing about 50% of the database plus basic information of pages.
<br>
Revised ReadMe file of the master branch and minor changes of the database.
<br>
Will continue on resolving the Beta focuses 1, 2, & 4 as indicated above together with Ali.
<br>
Individual time spent on Milestone 8: 15 hours
<br>
Individual time will be spent on Milestone 9: 10 hours
Nick (Front-End):
<br>
Completed testing of the database of the project created by Jordan and Ali.
Revised ReadMe file of the master branch together with Jordan after minor changes.
Worked on the styling of ejs pages: Homepage(index), Flights, Payment with required contents.
<br>
Will continue to resolve issues regarding the Beta focus 3 and reaming Alpha focus 5, 6, 7 and 8 as indicated above.
<br>
Individual time spent on Milestone 8: 8 hours
<br>
Individual time will be spent on Milestone 9: 10 hours
Wes (Front-End):
<br>
Created and summarized Milestone 8 at Wiki.
<br>
Finished the final formatting of this milestone.
<br>
Worked on the styling of ejs pages: Summary and About Page with required contents.
<br>
Completed testing of Product Alpha with desired coverages, user stories 5 to 8.
<br>
Will work closely with Nick tackling the Beta focus 3 and remaining Alpha focus 5, 6, 7 and 8 as indicated above.
<br>
Individual time spent on Milestone 8: 8 hours
<br>
Individual time will be spent on Milestone 9: 10 hours
Quick Meeting Minutes
Quick Meeting Minutes
Date: March 24, 2020 Thursday
Date: March 24, 2020 Thursday
...
...
...
...