**1. Product Version 2 (roughly 75% of the project implemented):**
- Implementation of 1-2 additional epics (compared to product version 1).
- Make sure all code is committed on GitLab by the deadline.
- Track the user stories in your product backlog accordingly.
**2. Test/QA Plan (should contain the following info):**
- Introduction - A brief description of the quality assurance strategies you are using
- Scope - The features/requirements/user stories (functional and non-functional) that will be checked and those that will not be checked.
- Test methodology - deliverables, strategies/approach (unit, regression, system/integration, acceptance), bug reporting, test tools (See the "test plan" document on Canvas as a guide
- List the test cases used to evaluate (at least 10 test cases for each user story)
**3. Inspection/Review**
- As a group, customize the code inspection document/checklist (which will be provided in the lecture) and add other appropriate items to fit your product (giving us an exact replica of the checklist will be a zero).
- Use the checklist to check another team member’s code (you cannot check your own code). Each team member needs to submit a report.
**4. Contributions and Action Plan **
- Provide a list of who did what for this milestone and assign a % for their contribution and who will work on what for the next milestone.